Under Construction,Delaying,and Bacon Strips :D

Status
Not open for further replies.
Hello. CMT for Timid and Adamant P:

Torchic
Ability:Speed Boost
Nature: Adamant/Jolly/Timid
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me
 
cmt for
Kurt's Shiny Thundorus :D

Timid
IV: TBD (HP Ice)
EV: 4/0/0/254/0/252
OT: Kurt
ID: 00007
AR Cloned by me


do you have it UT
 
Fenix54's Volcarona

Nature: Timid Ability: Flame Body
Hidden Power: Ice 70 Location: Route 3 Date : March, 3. 2011
EV: 6/0/0/252/0/252
IVs: 31 HP | 30 Atk | 30 Def | 31 SpA | 31 SpD | 31 Spe
Avaiable as UT Level 1
Morning Sun


i could give

a shiny flawless starly
a shiny yanma 31/31/31/30/30/31
a shiny flawless Azelf
a shiny flawless Vulpix
a shiny Moltres Ivs are 31/x/31/30/31/31
a Petlil IVs: 31 / 30 / 31 / 30 / 31 / 30

Nature: Modest
Ability: Chlorophyll

thats what i have to offer
these are all Ut
 
in response on your cmt i like this

Volcarona NN:Mothra

Male Lv.100
Timid Flame Body
shiny
Held Item: Life Orb
OT:Jim ID:42521
IVs:31/31/31/30/30/31
EVs:4 DEF/ 252 SpA/ 252 Speed
Moveset: Quiver Dance, Bug Buzz, Flamethrower, HPGround 70
AR Cloned by me
 
CMT for this
(★)
#079 Slowpoke
OT: Kai | ID No.: 50182 | Gender: Male
Nature: Modest | Ability: Regenerator | Type: Water-Psychic
Hidden Power: N/A
IV: 31 /28/31/31/31/31
EV: UT | Level: 1
Moves: Yawn | Flamethrower | Scald | Rain Dance
Note: Tesseraction gave me semi-redistribution rights to this pokemon. Mentioned with his thread here. I can trade it but you can't.
Musica's Zapdos (Genderless)
Modest - Pressure
OT: Musica ID 35770
31/7/31/31/31/30 HP Ice
Thunderbolt/Protect/Roost/Hidden Power
 

Azure Demon

Guest
cmt for these


Espeon

Ability:Magic Bounce
Nature: Modest
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Leavanny

Female Lv.100
Jolly Chlorophyll
Life Orb
OT: Jim ID: 42521
IVs: 31/31/31/29/31/31
EVs: 104 hp/ 252 atk/ 152 speed
Moveset: Swords Dance, Leaf Blade, X-Scissor, Shadow Claw
AR Cloned by me

Crustle NN:Krusty

Male Lv.100
Jolly Sturdy
Shiny
Expert Belt
OT: Jim ID: 42521
IVs: 31/31/31/1/31/31
EVs: 4hp/ 252 atk/ 252 speed
Moveset: Shell Smash, X-Scissor, Stone Edge, Earthquake
AR Cloned by me
 
In response i would like:

Registeel, Carefull, Electric HP
OT:Mat ID:19849
IV:31/31/31/30/31/31
AR Cloned by me

Kurt raikou
Timid
OT: Kurt
ID 56569
IV 31/3/31/31/30/31 Grass HP
EV: 6/0/0/252/0/252
AR Cloned by me

The other one would be either DW natu or carvanha but they are NFT so...just these 2.VM tomorrow at night
 
Sorry, I don't want any of Bond's DW events, as they're worthless to me (I'm a collector, so I don't want any Entree Forest hack in my collection, even if they're hex flawless, hidden power, whatever). -_-"

As for other stuffs, sorry, nothing I really like. -_-"
 
CMT for:
Shiny Zoroark



OT: Alex
ID: 61657
IV: 31/31/31/30/31/31 HP Electric
EV: 6/0/0/252/0/252
AR Cloned by me

Hydreigon NN:Ghidorah

Male Lv.100
Modest Levitate
Shiny
Held Item: Life orb
OT:Jim ID:42521
IVs:31/31/11/31/31/31
EVs: 4 HP/ 252 SpA/ 252 Speed
Moveset: Dragon Pulse, Fireblast, Surf, U-Turn
AR Cloned by me
 

Azure Demon

Guest
I'll take these


Mat's Shiny Jolly Minccino

OT:Mat
ID: 30160
Technician
IV: 31 / 31 / 31 / 31 / 31 / 31

and


Exeggcute (Female)

Ability:Harvest
Nature: Modest
OT:Mat
ID:30160
IV:31/31/31/31/31/30
AR cloned by me
 

Male Lv.100
Modest Levitate
Shiny
Held Item: Life orb
OT:Jim ID:42521
IVs:31/31/11/31/31/31
EVs: 4 HP/ 252 SpA/ 252 Speed
Moveset: Dragon Pulse, Fireblast, Surf, U-Turn
AR Cloned by me

CMT, and if possible nickname "Sazandora"
 
CMT for this (My shop has had major updates since last time, 8 new catches by me, 20+ to come):

Ability:Chlorophyll
Nature: Modest
OT:Mat
ID:30160
IV:HP Fire 70
AR cloned by me

BTW what are its IVs, cuz it could be all 3's for all I know.
 
CMT for
Jolteon

Ability:Quick Feet
Nature: Timid
OT:Mat
ID:30160
IV:
AR cloned by me

Flareon

Ability:Guts
Nature:Adamant
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me
Exeggcute (Female)

Ability:Harvest
Nature: Modest
OT:Mat
ID:30160
IV:31/31/31/31/31/30
AR cloned by me
 
Kurt's Shiny Thundorus :D

Timid
IV: TBD (HP Ice)
EV: 4/0/0/254/0/252
OT: Kurt
ID: 00007
AR Cloned by me

I would like this in reply to your CMt, but I won't be able to trade until tomorrow/sunday.
 
In response to your CMT:

CMT for this


Suicune lvl 40 -ut (OT: Zelenia ID: 16040)
Pressure | Route 25
Moon Ball|Timid |30 / 18 / 31 / 30 / 31 / 30 | FIRE 70 | Non-Redi | CP for ShinySuicune
Registeel, Carefull, Electric HP
OT:Mat ID:19849
IV:31/31/31/30/31/31
AR Cloned by me
 
Hi you want only my jirachi?? i want this so CMT if there's something else:

Shiny Jirachi
Serious
IV:29 10 31 25 23 21
AR Cloned by me

Dream World

Charmander

Ability:Solar Power
Nature: Modest,timid,jolly
OT:Mat
ID:30160
IV:
AR cloned by me

Torchic

Ability:Speed Boost
Nature: Adamant/Jolly/Timid
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me
Eeveelutions

Jolteon

Ability:Quick Feet
Nature: Timid/Naive/Hasty/Naughty/Mild/Modest
OT:Mat
ID:30160
IV:
AR cloned by me

Flareon

Ability:Guts
Nature: Modest/Brave/Careful/Adamant
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me


Vaporeon

Ability:Hydration
Nature: Bold/Modest/Calm
OT:Mat
ID:30160
IV:31/31/31/31/31/31
Modest Vaporeon also have an 31/31/31/30/31/31 (HP Elec)
AR cloned by me

Espeon

Ability:Magic Bounce
Nature: Mild/Modest/Timid
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Umbreon

Ability:Inner Focus
Nature: Sassy/Careful/Relaxed/Impish
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Leafeon

Ability: Chlorophyll
Nature: Jolly
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Glaceon

Ability:Ice Body
Nature: Timid/Modest
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Bulbasaur (male)

Ability:Chlorophyll
Nature: Modest/Careful/Timid/Mild/Calm/
OT:Mat
ID:30160
IV:HP Fire 70
AR cloned by me
 
Status
Not open for further replies.

Users Who Are Viewing This Thread (Users: 1, Guests: 1)

Top